News & Update
š 2025-10 ā Master Suite & Outdoor Bathroom Upgrade
In October 2025, Casa Luana completed the second phase of the bathroom transformationāfocused on two of the most important spaces in the property. Renovations included:
- a full remodel of the master bathroom, including new porcelain finishes, modern hardware, and a comfortable spa-like layout
- upgrading the outdoor bathroom with new tile, fixtures, and improved usability for poolside guests
- installing updated lighting and reworking small details to create a clean, bright environment
- redesigned the three arches at the living room entrance with a new, modern, artistic style
- installed custom wood-panel headboards in all five bedrooms
This second phase completed the full modernization of all Casa Luana bathrooms, bringing the entire home to a unified, elegant design standard.
š 2025-08 ā First Phase of Bathroom Renovations
In August 2025, Casa Luana completed the first major phase of bathroom remodeling. This update focused on improving comfort, modernizing outdated spaces, and creating a more cohesive boutique-hotel experience throughout the home. Renovations included:
- fully remodeling the downstairs bathroom
- updating the shared bathroom of the two adjacent bedrooms
- remodeling the bathroom in the Phoenix Room (junior master suite)
- replacing all tiles using high-quality porcelain materials
- installing modern fixtures, improved lighting, and clean, contemporary finishes
- replaced all ceiling fans in every room (all five bedrooms, master closet, master suite, kitchen, dining room, outdoor areas) with brand new models
- replaced every wall electrical outlet and cover throughout the house with new modern fittings
This phase transformed three older bathrooms into fresh, modern, and functional spaces that set the tone for Casa Luanaās new luxury standard.
šļø 2025-02 ā Front Entrance Transformation
- installed four custom stone columns sourced from Guadalajara, each designed to blend modern lines with traditional Mexican craftsmanship
- upgraded the entire front wall and faƧade with new design elements for a stronger curb appeal
- refreshed the front-door area with improved proportions, textures, and visual symmetry
- reworked the entrance layout to create a more welcoming, elegant arrival experience for guests
āØļø 2024-11 ā Pool Heater Installation
- installed a high-capacity professional pool heater
- extended the season for comfortable swimming, even during cooler months
- improved overall guest experience for winter and early-spring stays
šæ 2024-10 ā Outdoor Expansion & Garden Transformation
In October 2024, Casa Luana focused entirely on transforming the outdoor areas to feel like a private resortāgreen, peaceful, and beautifully designed. This phase elevated both functionality and atmosphere, adding new structures, new plant life, and improved outdoor comfort. Upgrades included:
- planting a large collection of tropical plants and trees to bring softness and shade
- adding tall climbing vines across the walls to create depth and a natural, organic look
- installing a full wood deck surrounding the pool for a warmer, more cohesive outdoor floor
- adding new outdoor furniture to improve lounge and dining comfort
- building an outdoor shower for convenience after the pool
- constructing a pergola (gran sala) to create a shaded, ventilated social space
These changes turned the garden into a green retreatāideal for morning coffee, family gatherings, or quiet evenings outdoors.
āļø 2024-06 ā Second Solar Panel Installation
- added a second solar system to fully support the homeās increased energy needs
- significantly reduced dependence on the local electrical grid
- enhanced efficiency for A/C, pool systems, and daily guest usage
š§2023-10 ā New Cistern Installation
- replaced the old cisterna, which had been damaged by river overflow during a hurricane
- upgraded to a larger, more durable tank built for long-term reliability
- improved water storage stability for the entire house
- reduced risk of water shortages during heavy-use periods or municipal outages
š§ 2023-08ā Full Kitchen Reconstruction
In August 2023, Casa Luana completed its first major structural remodel: a full kitchen reconstruction to modernize function, efficiency, and reliability. The original kitchen was dated and built with old materials (concrete counters, aging cabinets, older plumbing), so we rebuilt everything from zero. This upgrade included:
- removing the dividing wall to make the dining room and kitchen a single open space
- rebuilding all cabinetry with soft-close, water-resistant materials
- installing stone-composite countertops and matching backsplash
- replacing all plumbing lines, valves, and connectors under every sink
- upgrading every appliance (refrigerator, stove, oven, microwave, dishwasher, and hood)
- adding modern fixtures such as a pull-down faucet and updated drains
- sanding and repainting all nearby window and door frames in a contemporary silver-gray finish
The result is a modern, clean, highly functional kitchen that supports large-group cooking and hotel-level hospitality.
āļø 2022-01 ā First Solar Panel Installation
- installed Casa Luanaās first full solar system to reduce electricity cost
- improved power stability during high-usage seasons
- marked the beginning of Casa Luanaās long-term shift toward sustainability